Bradford College is currently in the process of developing its multi-million pound campus situated in the centre of the Bradford. The two year project to construct the technology-rich learning centre is on track to be completed by September 2014.

Lakesmere, building envelope specialists specified NVELOPE’s NV1 systems.

“The NV1 is a very simple hands free bracket system, which was easy to align and adjust on the job” said John Dickson, Construction Manager of Lakesmere.

Storage around the site was limited and all deliveries were scheduled to arrive on a timely manner. While this was an issue, the ability to fix the NVELOPE brackets quickly and easily helped speed up the installation.

NVELOPE’s NV1 flexible point brackets were well suited for this project as they allow for expansion and contraction of the cladding when under strain from various weather conditions including strong winds.

Manufactured in the UK and developed using the highest specification alloys, NVELOPE products and systems are ideal for supporting a wide variety of façade materials.