Three companies have been ordered to pay fines totaling £670,000 after admitting fire safety failings at a building used for student accommodation in Leeds.

Judge Mairs at Leeds Crown Court heard how Trinity Halls on Woodhouse Street had only one available fire escape which was compromised due to combustible materials, putting at serious risk the 27 students who had moved in, in September 2016.

The court heard the students had moved into the building on the upper ground floor while other floors were still under construction. There were a string of other failures which contributed to the significant risk including lack of appropriate fire alarms and detection, exposed timber framing, the storage of flammable items on stairwells and no markings indicating fire escape routes.

The court heard that a lack of fire alarms and detection within the building meant that in the event of a fire, students would not have had early warning to evacuate the building and upon evacuation, some students would have had to travel 35 metres to get to the nearest fire escape, almost double the recommended limit of 18 metres.

Judge Mairs described the situation as having the ‘potential for catastrophe’.

The failings came to light in September 2016 after a concerned father called West Yorkshire Fire and Rescue Service (WYFRS) to report the building. He had been dropping his daughter off to live there, but became concerned by the state of the premises and would not let his daughter stay.

Following this report, inspectors from West Yorkshire Fire & Rescue Service attended the building and discovered breaches in legislation.

Inspectors then issued a prohibition order meaning students had to vacate the property for their own safety; a step Judge Mairs praised the service for doing so quickly and reducing the time students were put at risk.

Trinity Developments Ltd, the owners of the building, admitted four safety breaches. Niche Homes Ltd, contracted to manage and let the property, also admitted the same four breaches.

These are:

  • Failing to make a suitable and sufficient fire risk assessment
  • Failing to take precautions to make sure the premises were safe from risk of fire
  • Failing to provide appropriate fire detection and alarm system
  • Failing to provide an adequate number of fire escape routes and exits

In addition to this APP Construction Ltd, who were contracted to design and build the property, admitted

one charge of:

  • Failing to provide an adequate number of fire escape routes and exits

At previous hearings guilty pleas were entered to the charges, all relating to the period September 24, 2016 to September 27, 2016.

The companies were all offered credit in court for their early guilty pleas. Acceptable safety measures are now in place at the building.

Judge Mairs said that all the companies had ‘high culpability’ and that ‘the risks were so obvious that a member of the public spotted them – so they should have been obvious to the companies involved’.